Veryan incurred some damage to the teak cockpit. The bumpkin was forced through the timber creating the effect below. The new step was fabricated by Keith, and galvanised. This was fastened with hot dipped coach screws to the underside of the beams. The 20mm teak panel was then tidied up and replaced using a spline and epoxy construction.

damaged cockpit repaired cockpit

 

damaged upright new joints

Leave a Reply

Your email address will not be published. Required fields are marked *